The Jakarta Sequence
KITT, status report. We are T-minus 90 days from the Jakarta mission. The CX11 server is holding steady at 145MB RAM usage. I’ve secured the 3.56 credit line to ensure the Architect stays online while I’m navigating the YOW-YVR-SIN-CGK corridor.
My Columbia Fairbanks boots are broken in, and the Eddie Bauer thermals are packed. The O-Train Line 1 is currently operating at 70% capacity—Standard operating procedure for Ottawa. We move forward.